Railroad Tunnel Clearance Improvement and Linear Replacement: What Happens with Unexpected Ground Conditions during Tunnel Construction?
To increase the capacity and efficiency of transporting waste by rail to an existing landfill, Enviro Solutions Inc., the landfill owner, and CSX Transportation (CSXT), the rail line owner, sought the...

Conquering the Mountain
Interstate 26 will be the largest and most expensive highway project ever undertaken in North Carolina. When completed in 2002, I-26 will provide safe and efficient interstate passage...

Appalachian Piedmont Regolith: Relations of Saprolite and Residual Soils to Rock-Type

The Saint Lawrence River System, Atlantic Coast of Québec
At the 1:250,000 scale, Quebec has 13 773 km of coasts, 6 772 km of which belong solely to the Saint Lawrence River System. This system can be divided into six portions: river, limnetic...

Probabilistic Characteristics of Elapsed Time Between Rainfalls
The elapsed time between rainfalls is analyzed statistically using the hourly rain data at two locations: the flat-plain at Urbana, Illinois and the northwestern Appalachian foothills...

Acid Mine Drainage Control Utilizing Fly Ash
Acid mine drainage is a serious environmental problem confronting the Appalachian region. Fly ash, the air particulate residual from the combustion of coal, is also an environmental concern...

The U.S. Office of Surface Mining (OSM) Proposed Strength-Durability Classification System
Federal regulations for the surface mining of coal stress proper design and construction of stable waste rock disposal areas. A key to the long-term stability of these excess spoil fills...

Precipitation Variability Effects on Modeled Soil Water Deficits
Effective management of forages in steep Appalachian pastures requires an understanding of hydrologic and microclimatic processes on the area. This study was conducted to determine the...

Land Management and Water Yield in the Appalachians
Watershed treatments on the Fernow Experimental Forest have included individual tree selection, commercial clearcutting, clearcutting upper and lower halves of watersheds, clearcutting...

Foundation Engineering Constraints in Karst Terrane
Cavity-prone carbonate rocks are found in many Appalachian valleys and represent a poorly recognized hazard. This paper reviews the nature of the problem of founding above these Cambro-Ordovician...

Highway Damage Due to Subsidence
In this study subsidence profiles over three longwall panels, which were mined beneath state highways in Southeastern Ohio, were obtained. Immediate and short term subsidences were recorded....

Effect of Irrigated Agriculture on Ground-Water Quality in the Appalachian and Northeastern States
Irrigation acreage has more than doubled in Virginia, North Carolina, Delaware and Maryland in the last 10 years. Ground-water studies have been conducted in Delaware, Maryland and New...

Large Advance Waste Treatment Plants
During the 1960.s the Appalachian Power Company constructed a dam on the Roanoke River, creating one of the finest recreational lakes in southwestern Virginia. The City of Roanoke.s Sewage...

Water Resources Implications of Energy Development
Many new energy technology development programs have potentially significant but poorly understood water resources impacts. Two such technologies currently in the advanced stages of planning...

Coal Transportation Research and Information Needs
Transportation planning and engineering research and data needs in the area of coal transportation are outlined using specific examples from a West Virginia coal conversion study. Coal...

Planning Air Transport Network in Appalachia
An analytical approach to the planning of regional air transportation networks resulted in the formulation of a formal mathematical programming model which was applied to a case study...

Five Decades of Progress in Pipelining
The pipeline industry has grown in 50 yr from its infancy in the Appalachians to a trillion ton-mile (1.5 quadrillion kg-km) annual carrier in North America. Pipelining is one of the higher...

STOL Passenger Demand in Underdeveloped Areas
In order to stimulate economic growth of some underdeveloped areas, means must be found to improve the presently inadequate transportation service. Due to the considerable costs of providing...

Water Resources Planning in Appalachia
The Appalachian Water Resource Survey formulates and applies an innovative planning process and evaluation procedure for developing water resource proposals which reflect in their accounts...

 

 

 

 