Phased Pumped Storage Planning and Site Evaluation
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process...

Eminent Domain Under the Federal Power Act: Use by Private Developers to Acquire Small Sites
From the first reported case in 1922 (Alabama Power Co. v. Gulf Power Co. , 283 F. 606 (D. Ala. 1922)), through 1982 (Greenup County By and Through Ousley v. Utilities Comm'n...

Irrigation and Groundwater Quality in the South
Impact of irrigation trend, water table fluctuations, crop management, and tillage systems on groundwater quantity and quality of the southeast (Alabama, Florida, Georgia, and South Carolina)...

Dune Construction on Perdido Key, Alabama
In recent years, the Alabama coast has experienced significant pressures for development. To make development compatible with beach preservation, the Alabama Department of Environmental...

Application of Estuarine Habitat Models in Alabama
The development of quantitative impact assessment methods over the past decade has improved our ability to identify environmental losses and recommend appropriate compensation measures...

Onsite Storage Facility for Low Level Radwaste
The Tennessee Valley Authority (TVA) has designed and constructed an onsite storage facility for low level radwaste (LLRW) at its Browns Ferry Nuclear Plant in northern Alabama. The paper...

Instrumentation Performance in Soft Clay Soils (A Case History)
In 1978, IDEAL BASIC INDUSTRIES, INC. initiated construction of a cement manufacturing plant located south of Mobile, Alabama on the Theodore Ship Channel. Because deltaic clays were too...

Wetlands Development in Moderate Wave-Energy Climates
For the last three years springs of Spartina alterniflora have been planted on portions of Theodore Island, a dredged material island in Mobile Bay, Alabama. The purpose of the planting...

A Methodology for Open-Water Disposal Site Selection
Pascagoula, Mississippi, is the major industrial region in coastal Mississippi. The existing project, completed in 1965, provides for waterborne transportation from the Gulf of Mexico...

Long-Term Planning for Dredged Material Disposal
The dredged material produced from maintenance of the channel in Upper Mobile Harbor (UMH) is disposed into confined upland disposal areas provided by the project's local...

Selection of Computers for Education

Hurricane Impact at Dauphin Island, Alabama

Welded Space-Frame Pipe Rupture/Anchor Restraints at the Bellefonte Nuclear Plant

Mobile Bay Hydrography Under Flood Stage Conditions

Hydrodynamic and Material Transport Model for Mobile Bay, Alabama

Performance Record of Walter F. George Lock & Dam

Discussion of "The Lock 12 Development of the Alabama Power Company, Coosa River, Alabama"

Discussion of "The Lock 12 Development of the Alabama Power Company, Coosa River, Alabama"

Discussion of "The Lock 12 Development of the Alabama Power Company, Coosa River, Alabama"

The Lock 12 Development of the Alabama Power Company, Coosa River, Alabama
DataNotAvailable...

 

 

 

 

Return to search