Design of the Main Bridge of the Huachiang Bridge

by Ching Chyuan Tzeng, China Engineering Consultants, Inc, Taipei, Taiwan,
Song Yu Lin, China Engineering Consultants, Inc, Taipei, Taiwan,
I-Lan Ou, China Engineering Consultants, Inc, Taipei, Taiwan,



Document Type: Proceeding Paper

Part of: Structural Engineering in Natural Hazards Mitigation

Abstract:

The Huachiang Bridge will be reconstructed by erecting the deck structure in two steps to avoid reducing or interfering with the bridge's traffic flow. Both the analysis and the detailed designs associated with this special construction procedure are the topics of this paper.



Subject Headings: Bridge design | Bridge decks | Construction management | Concrete bridges | Traffic flow | Case studies | Construction methods | Oregon | United States | North America | Taiwan | Asia

Services: Buy this book/Buy this article

 

Return to search