Rehabilitation of Victoria Dam

See related content

by Jonathan S. Field, Stone & Webster Engineering, Corp, Denver, CO, USA,

Document Type: Proceeding Paper

Part of: Waterpower '85:

Abstract: Rehabilitation of a 54-year old thin concrete arch-buttress dam was completed without interruption of power generation using pressure injection of an epoxy adhesive. This paper presents the case history of the investigations made in development of the rehabilitation program, the final methods selected, the results obtained, and the conclusions reached. Methods investigated and used to establish the concrete conditions and extent of rehabilitation required; prepare the structures for injection; establish materials, equipment, and techniques for injection; investigate and verify the adequacy of injection; and analyze and document the results are presented.

Subject Headings: Rehabilitation | Concrete dams | Dams | Arch dams | Case studies | Epoxy | Adhesives | Concrete structures | Australia | Victoria

Services: Buy this book/Buy this article


Return to search