Aguada Blanca Rockfill Dam with Metal Facing

by Piero Sembenelli, (M.ASCE), Head; Soil Mech. Dept., ELC-Electroconsult, Milano, Italy,
Marco Fagiolo, Head; Site Supervision Ofc., ELC-Electroconsult, Milano, Italy,

Serial Information: Journal of the Geotechnical Engineering Division, 1974, Vol. 100, Issue 1, Pg. 31-51

Document Type: Journal Paper

Discussion: Doughty S. Clifford (See full record)

Abstract: The 148-ft (45-m) high, steel faced Aguada Blanca rockfill dam is described. After a few general data on the hydraulic scheme, dam and appurtenant structures, local climate, and geology are summarized. The reasons for the major technical decisions and related design of rockfill dam body and 3/16-in. (5 mm) thick iron facing are presented. Construction methods and materials are reported concluding with a rapid description of grouting and drainage curtains. Some construction costs are also given with a preliminary evaluation of dam and facing performance.

Subject Headings: Earthfill dams | Rockfill dams | Rock fills | Construction materials | Construction methods | Hydrologic data | Weather forecasting |

Services: Buy this book/Buy this article


Return to search