Tunnel Survey and Tunneling Machine Control

by Edward W. Peterson, (F.ASCE), Manager of Constr.; Bechtel Corp., Power & Industrial Div.,
Peter Frobenius, Engrg. Supervisor; Bechtel Inc., San Francisco, CA,


Serial Information: Journal of the Surveying and Mapping Division, 1973, Vol. 99, Issue 1, Pg. 21-37


Document Type: Journal Paper

Discussion: Angarola Ralph J. (See full record)

Abstract: An outline of the survey work necessary for the construction of a large tunnel project such as the San Francisco Bay area Rapid Transit System is presented. In the second part of the paper, a method for shield or tunneling machine control by laser and double target is described. This method has proven successful during the driving of the tunnels of the BART system both by hand and machine methods.

Subject Headings: Tunneling | Equipment and machinery | Control surveys | Rapid transit systems | Construction equipment | Construction management | Surveys (non-geomatic) | Bays | Lasers | North America | California | San Francisco Bay Area | United States

Services: Buy this book/Buy this article

 

Return to search