Design and Construction Features: Boundary Project (1965 Power Division Specialty Conference, in Denver Colorado)

by H. V. Strandberg,

Serial Information: Journal of the Power Division, 1966, Vol. 92, Issue 2, Pg. 157-180

Document Type: Journal Paper

Abstract: Details of the design and construction of the 600,000-kw Boundary Project are described with special emphasis on the topographic and geological features of the project works area, consideration of which ultimately lead to the choice of a double curvature concrete arch dam and an underground power plant for the development of this site. The excellent balance between site investigation, design and the layout of the project features to minimize construction cost is brought out in describing the project.

Subject Headings: Construction management | Domain boundary | Power plants | Construction sites | Underground construction | Site investigation | Arch dams | Concrete dams | Concrete construction | Infrastructure construction | North America | Colorado | United States | Denver

Services: Buy this book/Buy this article


Return to search