Installation Procedure for Hot Metal Facility

by L. Earl Tabler, Jr.,

Serial Information: Journal of the Construction Division, 1965, Vol. 91, Issue 1, Pg. 179-190

Document Type: Journal Paper

Abstract: Field experience demonstrates that construction ingenuity and critical path scheduling work well together to complete the installation of a hot metal facility on time. Special attention is given to the handling and installation of the hot blast cupola, which is the heart of this facility. The cupola is followed from the fabricating yard to its final location in an existing hot metal producing plant. Because the new cupola replaces an operational one and uses the same foundation, a plant shutdown is required for the final phases of construction. Critical path scheduling is used as the tool to plan and control all steps of the project from the engineering stage through the construction stage. Control was enhanced by a reporting system that used IBM cards as a reporting media to management.

Subject Headings: Construction management | Metals (chemical) | Critical path method | Scheduling | Blasting effects | Fabrication | Existing buildings | Professional societies |

Services: Buy this book/Buy this article


Return to search