John Day Lock and Dam: Planning and Site Selection

by J.F. Bruce,
Von Gunten G.H.,


Serial Information: Journal of the Power Division, 1962, Vol. 88, Issue 2, Pg. 35-56


Document Type: Journal Paper

Abstract: Project now under construction on lower Columbia River, is multipurpose navigation, flood control, and power project, forming final link in slack-water development; important factors in project planning and study procedures that lead to economic determination of site, layout, and operating pool levels are presented; method of river diversion during construction establishment of size, characteristics, and number of generating units, and other project features are examined.

Subject Headings: Construction methods | Construction sites | Rivers and streams | Economic factors | Locks (dam) | Navigation (waterway) | Floods | Project management

Services: Buy this book/Buy this article

 

Return to search