Stilling Basin Damage at Chief Joseph Dam

by R.H. Gedney,


Serial Information: Journal of the Hydraulics Division, 1961, Vol. 87, Issue 2, Pg. 97-120


Document Type: Journal Paper

Abstract: 200 ft high dam has tainter-gate controlled ogee spillway that discharges into hydraulic jump-type, energy dissipator with single row of baffles and end sill; damages in concrete of stilling basin were discovered 2 yr after project became operative; evaluation of conditions that are considered to have contributed to damage.

Subject Headings: Damage (structural) | Concrete dams | Damage (material) | Stilling basins | Spillways | Water discharge | Hydraulics | Energy dissipation

Services: Buy this book/Buy this article

 

Return to search