Concrete Addition to Cellular Sheet Pile Shipway

by J.W. Irvine,
R.F. Gaston,


Serial Information: Journal of the Construction Division, 1960, Vol. 86, Issue 2, Pg. 27-36


Document Type: Journal Paper

Abstract:

Construction of first nuclear powered aircraft carrier necessitated lengthening of submerged Shipway No. 11; additional length of 100 ft to existing cellular sheet piling structure was provided by sinking reinforced concrete trapezoidal shaped cofferdam with aid of open dredged wells.



Subject Headings: Lightweight concrete | Concrete piles | Sheet piles | Reinforced concrete | Concrete construction | Aircraft and spacecraft | Submerging | Existing buildings

Services: Buy this book/Buy this article

 

Return to search