St. Lucie No. 2 Foundation Construction

by James P. Burket, Principal Civil Engineer; Ebasco Services, Inc., New York, N.Y.,
Hung Jen Kuo, Chief Civ. Engr.; Ebasco Services, Inc., Newport Beach, Calif. 92660,


Serial Information: Journal of the Construction Division, 1981, Vol. 107, Issue 2, Pg. 393-404


Document Type: Journal Paper

Abstract: St. Lucie Unit No. 2 is an extension and a duplication of the St. Lucie Unit No. 1 which is a nuclear power generating station of 790 MW capacity utilizing a two loop PWR nuclear steam supply system. The construction of the Unit 2 Reactor Building (RB) foundation (adjacent to the existing Unit 1) required special provisions to assure the safe operation of Unit 1. The circular cofferdam that was designed and constructed to meet all seismic category I requirements for the construction of Unit no. 2 RB foundation is considered. Restrictions and tests required for sheet pile driving are also presented.

Subject Headings: Foundation construction | Steam power | Power plants | Construction management | Pile tests | Nuclear power | Existing buildings | Occupational safety

Services: Buy this book/Buy this article

 

Return to search