Setting Highway Construction Contract Duration

by Donn E. Hancher, (M.ASCE), Assoc. Prof. of Construction Engrg. and Management; School of Civ. Engrg., Purdue Univ., of West Lafayette, Ind. 47907,
James E. Rowings, (A.M.ASCE), Grad. Research Asst.; School of Civ. Engrg., Purdue Univ., West Lafayette, Ind. 47907,

Serial Information: Journal of the Construction Division, 1981, Vol. 107, Issue 2, Pg. 169-179

Document Type: Journal Paper

Abstract: A research study was performed to evaluate the methodologies used by transportation agencies to establish the contract durations used for highway construction projects. The study was financed by the Indiana State Highway Commission (ISHC). After reviewing the system used in Indiana, those used by other transporation agencies were also studied. Methods used vary from broad conceptual estimates to detailed critical path scheduling techniques. A method is proposed for the ISHC which incorporates some of the advantages of critical path methods, but does not require the preparation of a graphic network. The method should provide more consistency in the determination of contract time estimates by highway personnel. It should also provide a schedule guide for the field engineers during construction.

Subject Headings: Infrastructure construction | Contracts | Critical path method | Graphic methods | Scheduling | Construction methods | Transportation studies | Highway transportation | North America | United States | Indiana